Shubh Consult
Solid Waste Management Systems for Multi-ULB Clusters
Waste ManagementEnvironmental Engineering

Solid Waste Management Systems for Multi-ULB Clusters

Overview

Shubh Consultants prepared DPRs for integrated solid waste management systems across in Assam, covering the entire waste lifecycle—from generation to processing and disposal.

Project Coverage

  • Cluster-based ULB planning
  • Lack of existing processing infrastructure
  • Mixed waste streams with low segregation

What We Actually Did

A detailed breakdown of our engineering approach and delivery.

Waste Assessment

  • Quantification and characterization of waste
  • Forecasting based on population growth

System Design

  • Planning of:
  • Sanitary landfills
  • Composting units
  • Material Recovery Facilities (MRFs)

Site Selection

  • Evaluation based on:
  • Environmental impact
  • Accessibility
  • Expansion potential

DPR Preparation

  • Engineering design
  • Costing and implementation strategy

Key Challenges Solved

1

Designing for heterogeneous waste streams

2

Balancing cost vs operational feasibility

3

Ensuring compliance with SWM Rules

Project Impact

Enabled structured waste systems across multiple ULBs

Shifted planning from dumping → processing

Related Domains & Services

Ready to Build Together?

Let's discuss how our infrastructure expertise can deliver results for your next project.

Get in Touch